WorldMark Granby Rocky Mountain Preserve

The scope of relocation included:

  • Warehousing and Distribution
  • Placement, Installation and Assembly

Location: Granby, CO

Length of project: Several Months

Grand Elk

 

Challenges

Hundreds of line items of different pieces needed for each room

Coordinating with the PM and GC on what the schedules are for the next load to be pulled and delivered 3.5 hours away

Amount of storage required a large amount of the warehouse to be consumed and storage containers to be dropped in our yard

Coordinating many shipping deliveries to not overbook our dock

[envira-gallery id=”403″]