Wyndham Grand Elk

Warehousing and Distribution Placement, Installation and Assembly Location: Grandy, CO Size: 4-unit vacation ownership resort 8,000 feet above sea level

Poplar Bluff Regional Medical Center

The scope of relocation included: Transition Planning and Scheduling Relocation Services Placement, Installation and Assembly Location: Poplar Bluff, MO Facility Size: 500,000 sq. ft.

Maine General Health

The scope of relocation included: Transition Planning and Scheduling Relocation Services Location: Agusta, ME Facility Size: 600,000 sq. ft. 

Ambassador Hotel

The scope of relocation included: Warehousing and Distribution Placement, Installation and Assembly Location: New Orleans, LA  

University of Texas Southwestern Medical Center

The scope of relocation included: Transition Planning and Scheduling Relocation Services Placement, Installation and Assembly Location: Dallas, TX Facility Size: 700,000 sq. ft. Workspace Innovations relocation division was honored with the opportunity to move this state of the art hospital.  Medical and hospital moving requires a special skill set.  It is critical that the delicate […]

Owensboro Health Regional Hospital

The scope of relocation included: Transition Planning and Scheduling Relocation Services Warehousing and Distribution Placement, Installation and Assembly Location: Owensboro, KY Facility Size: 1,000,000 sp. ft.

Biloxi VA Hospital

The scope of relocation included: Warehousing Distribution Relocation Services Placement, Installation and Assembly Location: Biloxi, MS Length of project: Multi-Year

Sutter Hospital

The scope of relocation included: Transition Planning and Scheduling Relocation Services Location: Santa Rosa, CA Facility Size: 400,00 sq. ft.

Rand Memorial Hospital

The scope of relocation included: Placement, Installation and Assembly Location: Freeport, Bahamas

Green Plains Corporate Headquarters

The scope of relocation included: Relocation Services Warehousing and Distribution Placement, Installation and Assembly Location: Omaha, Nebraska Length of project: 7 days [envira-gallery id=”405″]

WorldMark Granby Rocky Mountain Preserve

The scope of relocation included: Warehousing and Distribution Placement, Installation and Assembly Location: Granby, CO Length of project: Several Months  

The Crawford Hotel – Denver Union Station

The scope of relocation (112 rooms with 112 different layouts)  included: Warehousing and Distribution Placement, Installation, and Assembly Location: Denver, CO  

Samuel Simmonds Memorial Hospital

The scope of relocation included: Warehousing Distribution Placement, Installation and Assembly Location: Barrow, Alaska Length of project: 3 months Workspace Innovations’ relocation division was given the exceptional opportunity to relocate this beautiful Alaskan hospital. The new facility includes many expanded departments in its more than 100,000 square feet of space — four times larger than […]